GreenForge Manufacturing Solar Plant
Pune, Maharashtra · 10 MW
The Challenge
The client operated a 24/7 forging plant with spiralling power costs and frequent tariff volatility, demanding a 10 MW captive plant on a challenging 40-acre undulating site.
Our Solution
We engineered a single-axis tracker system with terrain-adaptive foundations, commissioned a 33 kV HT substation and signed a 20-year captive PPA with battery-assisted peaking.
The Result
The plant generates 16.8 GWh annually, cutting energy costs by 38% and offsetting 15,000 tonnes of CO₂ every year.