Case Study
Grand Square Mall Rooftop
Bengaluru, Karnataka · 2.5 MW
The Challenge
A 4-storey mall with multiple roof levels, HVAC shading and a strict no-penetration waterproofing mandate.
Our Solution
We used lightweight ballasted mounting on high-albedo roofing, deployed optimisers to counter HVAC shadows and installed an EV charging canopy at the entrance.
The Result
2.5 MW powers 60% of the mall’s daytime load, saving ₹1.2 crore annually and powering a 40-port EV charging plaza.
Ready to Switch to Solar Energy?
Get a free site assessment and custom solar proposal from our expert engineers within 24 hours.